Availability: | |
---|---|
Quantity: | |
COLOR | Field Green + Olive Green |
YARN | PE+ PP |
DTEX | 15,000 |
DENSITY | 14,700-21000 |
PILE HEIGHT | 25mm~50mm |
GAUGE | 3/8" |
BACKING | Double PP Cloth + SBR / PU |
WEARABILITY | <10%, after 3000 circuits |
UV-STABILITY | DIN53387 ≥6000hrs |
OCCASION | garden,balcony,rooftop,pool,residental |
WARRANTY | 8-10 Years |
COLOR | Field Green + Olive Green |
YARN | PE+ PP |
DTEX | 15,000 |
DENSITY | 14,700-21000 |
PILE HEIGHT | 25mm~50mm |
GAUGE | 3/8" |
BACKING | Double PP Cloth + SBR / PU |
WEARABILITY | <10%, after 3000 circuits |
UV-STABILITY | DIN53387 ≥6000hrs |
OCCASION | garden,balcony,rooftop,pool,residental |
WARRANTY | 8-10 Years |
1. The production process of artificial grass yarn:
Select high-standard main materials of Sinopec and PetroChina, add anti-aging agent, color masterbatch, antibacterial agent and other auxiliary materials; after uniform stirring, it is sucked into the furnace, melted at high temperature, and then enters the automatic drawing production equipment for extrusion, drafting, shaping and winding. And rewinding, etc., to get high-quality artificial grass.
2. Artificial turf tufting production process:
According to the requirements of the production process sheet, hook the corresponding artificial grass yarn to the designated position of the creel, the commissioner adjusts the artificial grass tufting machine to the specified process parameters, and the machine length starts the tufting machine to weave the artificial grass silk on the base fabric. .
3. Glue production process:
The semi-finished artificial turf after tufting enters the automatic gluing production equipment.
After a series of processes such as gluing, drying, drainage holes, winding and packaging, a roll of finished artificial turf is obtained.
1. The production process of artificial grass yarn:
Select high-standard main materials of Sinopec and PetroChina, add anti-aging agent, color masterbatch, antibacterial agent and other auxiliary materials; after uniform stirring, it is sucked into the furnace, melted at high temperature, and then enters the automatic drawing production equipment for extrusion, drafting, shaping and winding. And rewinding, etc., to get high-quality artificial grass.
2. Artificial turf tufting production process:
According to the requirements of the production process sheet, hook the corresponding artificial grass yarn to the designated position of the creel, the commissioner adjusts the artificial grass tufting machine to the specified process parameters, and the machine length starts the tufting machine to weave the artificial grass silk on the base fabric. .
3. Glue production process:
The semi-finished artificial turf after tufting enters the automatic gluing production equipment.
After a series of processes such as gluing, drying, drainage holes, winding and packaging, a roll of finished artificial turf is obtained.