We know that laying a soccer field is a huge and delicate project, according to the basic requirements of the field use, the foundation of sports turf made of sports grass is a cement concrete foundation or 10% cement stone powder foundation layer, after maintenance to meet the requirements, then lay the artificial turf made of sports grass, I will introduce you the main construction plan, the steps are as follows:
Here is the content list.
Check the site and determine the location
Splicing and bonding
Spreading quartz sand and rubber granules
Check whether the compactness and flatness of the sports turf base made of sports grass meet the requirements, and start paving the artificial turf once it does. Measure the whole site, determine the position of the pitch line and mark it well, mark it with different color ink, and determine the laying direction and position of the artificial sports grass.
Start to lay the artificial turf made of sports grass, lay the splicing tape on the joint surface of the turf, and fix it with steel nails, the steel nail head should not be raised, and the jointing area should be overlapped by more than 10㎝. Apply glue on the joint interface, and before the glue dries, lay the cut lawn flat and joint it so that each piece of artificial lawn is closely bonded to the other. Cut the green sports turf at the location where the white line is needed, put it on the connecting tape, to be coated with glue, then put the cut white artificial grass court line on the location of the line we marked before laying, and glue it up with the connecting tape.
When sprinkling quartz sand, pour quartz sand or black rubber into the sprinkler and push the sprinkler so that the surface of the artificial turf made of sports grass is filled with quartz sand or black rubber. The speed of pushing the sprinkler should be even, not too fast, and not too slow so that the thickness can be even. After laying the quartz sand or black rubber granules, it should be checked whether it is flat and sufficient, and any impurities found in the paving should be removed immediately to ensure quality. When laying, the quartz sand or rubber granules in the car should be kept dry at all times, to facilitate the flow of quartz sand or rubber granules in the laying. After the completion of quartz sand or rubber granules paving, you can also use hard brushes or light load dragging heavy brushes to pave back and forth to make the quartz sand fall fully dense, artificial turf paving is completed to accept clearly, and finally retired.
The above is the specific construction organization plan for soccer field artificial sports turf, perfect laying of a soccer field is needed for these steps, complete and perfect laying of a good soccer artificial turf for soccer players is equivalent to entering the soccer mecca, and we this soccer turf provides a good foundation for it. We hope this little introduction will be of help to you!